Parts
-
-
If your Tool Cooler is not already tapped from the manufacturer, proceed to tap each of the (4) marked holes for securing the water block with an M3x0.5 thread tap.
-
Attach all Tool Docks to CNC Tool Cooler using magnets as locating guides.
-
-
-
Loosely install Tool Wiper assembly to each Tool Dock using previously fitted fasteners. Final tightening will be performed during mounting procedure later in assembly.
-
-
-
Remove protective film from the face of the Water Manifold. Apply thermal paste. Fasten Water Manifold to the Tool Cooler rail using appropriate length M3 fasteners.
-
-
-
Orient the printer as shown. Loosely install Tool Dock Bank assembly to the upper 4040 extrusion using previously fitted fasteners as shown.
-